top of page

FINAL REPORT

This final thesis report consists of a yearlong study of the mechanical systems for the Commons at Stanton Square. This report is focused on the re-design of the mechanical systems in attempt to improve the already efficient existing systems of the building. In order to evaluate the success or failure of the proposed design options, initial studies took place to determine the existing ventilation system performance, load demands, energy performance, and current utility costs.

 

The main goals of the proposed designs are to be as energy efficient as possible while simultaneously keeping the total project cost at a reasonable value. These project goals are kept in mind when assessing each depth and breadth for feasibility.

Feel free to click the image to the left to read the full report of the mechanical redesign for the Commons at Stanton Square. 

exec.PNG

NEWSFEED

4/24/19 - CPEP Complete & Ready for Review

4/1/19 - Final Report Completed & Posted to CPEP

1/11/19 - Proposal Revised & Posted to CPEP

12/07/18 - Turned in Proposal & Posted to CPEP

11/16/18 - Breadth Topic Proposals

10/29/18 - Technical Report 3

10/26/18 - Project Abstract Posted to CPEP

10/01/18 - Building Statistics Posted to CPEP

09/28/18 - Technical Report 2 / Project Abstract Draft

09/14/18 - Student Bio Sketch

09/10/18 - CPEP Home Page Fully Functional / Tech Report Presentation

09/07/18 - Technical Report 1

09/04/18 - CPEP Home Page Draft

08/29/18 - Turned in Project Initiation Checklist Part 2

08/22/18 - Turned in Project Initiation Checklist Part 1

08/20/18 - Confirmed Master List Information

08/20/18 - Sent Personal Thank You Letters

08/06/18 - Obtained Project Documentation

07/09/18 - Owners Permission Received

Christina Kreamer
THE
COMMONS
AT
STANTON
SQUARE
bottom of page