THE COMMONS AT STANTON SQUARE
WASHINGTON, D.C.
CHRISTINA KREAMER | MECHANICAL
Dr. WILLIAM BAHNFLETH
PROPOSAL
Electrical Breadth _______________________________________________________________________Due to the mechanical systems being redesigned in the Commons at Stanton Square, the power distribution will also need to be reconfigured. The new electrical loads will need to be recalculated due to the mechanical equipment redesign. In addition, PV panels will be added on the roof in the location of the existing green roof. Therefore, an energy and cost savings analysis will be performed to see how long the payback period for the panels will be taking initial cost into consideration.
Plumbing Breadth _______________________________________________________________________Due to the green roof being replaced with the proposed PV panels stated in the Electrical Breadth, the storm water will need to be collected elsewhere. The green roof was originally a tool to collect storm water, and also keep the roof and a lower and more stable temperature especially in the summer heat. Due to the proposed change, this plumbing breadth will not only look into an alternate water collection system such as underground basins, but it will also include a comparative analysis between the benefits of the green roof vs. the benefits of the PV panels.
NEWSFEED
4/24/19 - CPEP Complete & Ready for Review
4/1/19 - Final Report Completed & Posted to CPEP
1/11/19 - Proposal Revised & Posted to CPEP
12/07/18 - Turned in Proposal & Posted to CPEP
11/16/18 - Breadth Topic Proposals
10/29/18 - Technical Report 3
10/26/18 - Project Abstract Posted to CPEP
10/01/18 - Building Statistics Posted to CPEP
09/28/18 - Technical Report 2 / Project Abstract Draft
09/14/18 - Student Bio Sketch
09/10/18 - CPEP Home Page Fully Functional / Tech Report Presentation
09/07/18 - Technical Report 1
09/04/18 - CPEP Home Page Draft
08/29/18 - Turned in Project Initiation Checklist Part 2
08/22/18 - Turned in Project Initiation Checklist Part 1
08/20/18 - Confirmed Master List Information
08/20/18 - Sent Personal Thank You Letters
08/06/18 - Obtained Project Documentation
07/09/18 - Owners Permission Received